ifference between revisions of "EMO:Equation Constraints Schedule"
(→Usage) |
(→Usage) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 69: | Line 69: | ||
− | '''WARNING!''' It is possible to create overlapping | + | '''WARNING!''' It is possible to create overlapping Equation Constraints using the Equation Constraint Schedule. ''EMarketOffer'' sorts the Equation Constraints by start and end dates and applies each one sequentially. This means that for any one period the last Constraint applied will be effective in the dispatch calculation. To see the actual order in which Equation Constraints will be applied refer to the '''''Edit Equation Constraint Window.''''' |
=== The Activate Equation Constraint(s) Window === | === The Activate Equation Constraint(s) Window === | ||
==== Purpose ==== | ==== Purpose ==== | ||
− | To activate one or more | + | To activate one or more Equation Constraints in a Forecast or Powerflow Case Definition. |
==== Features ==== | ==== Features ==== | ||
Line 83: | Line 83: | ||
:''Date Range Selector'' | :''Date Range Selector'' | ||
| | | | ||
− | :Allows you to select the date and time period range for which the | + | :Allows you to select the date and time period range for which the Equation Constraint will be effective. Note that "To" dates are inclusive, so include the final day and time period selected |
|- | |- | ||
| | | | ||
:''Constraint Selector Type Toggle Buttons'' | :''Constraint Selector Type Toggle Buttons'' | ||
| | | | ||
− | :Toggles the Constraint Selector from a drop down list (only selected | + | :Toggles the Constraint Selector from a drop down list (only selected Equation Constraints are displayed) to a Check List (all available Circuits are displayed) |
|- | |- | ||
| | | | ||
:''Drop Down Constraint Selection List (drop down mode)'' | :''Drop Down Constraint Selection List (drop down mode)'' | ||
| | | | ||
− | :Provides a list of available | + | :Provides a list of available Equation Constraint from a drop down list |
:It is possible to activate a whole category of Constraints at once by selecting Constraint Sets. Constraint sets appear in angled brackets at the top of the drop down list and provides all permutations of the following criteria: | :It is possible to activate a whole category of Constraints at once by selecting Constraint Sets. Constraint sets appear in angled brackets at the top of the drop down list and provides all permutations of the following criteria: | ||
Line 103: | Line 103: | ||
:''Drop Down Constraint Selection List (check list mode)'' | :''Drop Down Constraint Selection List (check list mode)'' | ||
| | | | ||
− | :Provides a list of available | + | :Provides a list of available Equation Constraint from a check list. Multiple selection using Constraint Sets and Watch Lists is available by clicking on the "+/- Sets" row at the head of the check list. |
|} | |} | ||
Line 109: | Line 109: | ||
Please refer to '''''[[EMO:Circuit_Outage_Schedule#The_Insert_Re-ratings_Window|Insert Re-rating Window]]''''' which has very similar functionality. | Please refer to '''''[[EMO:Circuit_Outage_Schedule#The_Insert_Re-ratings_Window|Insert Re-rating Window]]''''' which has very similar functionality. | ||
− | NOTE: New | + | NOTE: New Equation Constraints cannot be added here, you must use the Equation Constraints Data Grid instead. Constraints added using the Data Grid will automatically appear in the Constraint selection lists. |
− | [[ | + | [[Main Page|Home]] |
Latest revision as of 14:24, 7 February 2014
Purpose
To display all circuit Re-ratings in the Forecast or Powerflow Case Definition individually.
Items
Data Item | Description |
---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NOTE: The values of all fields in the Grid can be edited except for the Equation Constraint Name which can only be changed using the Edit Equation Constraint Window.
Usage
>> Double click a row to open the associated Edit Equation Constraint Window, where Constraint details can be edited.
>> To add a new Equation Constraint to the Schedule:
- Select a row containing the name of the Equation Constraint to be entered and press the <INSERT> key
- This opens the Activate Equation Constraint Window with the "current" Equation Constraint selected
NOTE: The Equation Constraint Dialogue lists only those named Equation Constraints that have been loaded into the Forecast Definition
>> To Edit details of an existing Equation Constraint in the Schedule:
- Highlight the Grid Cell you wish to alter (you can alter all fields except for the Equation Constraint Name)
- Type the new value in the Cell, or press <F2> to edit the current contents
>> To Delete an existing Equation Constraint from the Schedule:
- Press the <Delete> key. You will be asked to confirm the deletion before it takes place.
NOTE: The Equation Constraints Schedule Grid can be sorted by any column by double-clicking on the column header.
WARNING! It is possible to create overlapping Equation Constraints using the Equation Constraint Schedule. EMarketOffer sorts the Equation Constraints by start and end dates and applies each one sequentially. This means that for any one period the last Constraint applied will be effective in the dispatch calculation. To see the actual order in which Equation Constraints will be applied refer to the Edit Equation Constraint Window.
The Activate Equation Constraint(s) Window
Purpose
To activate one or more Equation Constraints in a Forecast or Powerflow Case Definition.
Features
Feature | Purpose |
---|---|
|
|
|
|
|
|
|
|
Usage
Please refer to Insert Re-rating Window which has very similar functionality.
NOTE: New Equation Constraints cannot be added here, you must use the Equation Constraints Data Grid instead. Constraints added using the Data Grid will automatically appear in the Constraint selection lists.