ifference between revisions of "EMO:Powerflow Analysis Inputs"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
:''Transmission System'' | :''Transmission System'' | ||
| | | | ||
+ | *Grid data files | ||
*Online databases | *Online databases | ||
− | |||
− | |||
− | |||
− | |||
| | | | ||
− | :''EMarketOffer'' can be configured to obtain Transmission System data from your online database, | + | :''EMarketOffer'' can be configured to obtain Transmission System data from your online database, however it is primarily designed to support the grid files available daily from the Energy Link web site. These files are used to to create a picture of the Transmission System for any valid historical date. In Power Flow mode, constraints and re-ratings are irrelevant as power flows in this mode are not constrained by market dispatch. |
|- | |- | ||
| | | |
Revision as of 18:19, 3 May 2013
Data Type | Sources | Comments |
---|---|---|
|
|
|
|
|
|
|
|
|