ifference between revisions of "EMO:Reserves"
Jump to navigation
Jump to search
(Created page with "{{#hidens:}} === The Reserve Management Tool === The inputs to the SPD solver are shown in the figure and table below (adapted from Transpower's Reserve Management Tool (RMT) ...") |
|||
Line 5: | Line 5: | ||
#Parameters that define the Reserves requirement are calculated mostly by a software application: the RMT. | #Parameters that define the Reserves requirement are calculated mostly by a software application: the RMT. | ||
[[File:Reserves.PNG]] | [[File:Reserves.PNG]] | ||
+ | |||
+ | {|class="wikitable" | ||
+ | ! Term !! Explanation | ||
+ | |- | ||
+ | | | ||
+ | :''Generation Offer'' | ||
+ | | | ||
+ | :Offer made to supply energy by generator | ||
+ | |- | ||
+ | | | ||
+ | :''Reserve Offer'' | ||
+ | | | ||
+ | :Offer made to supply reserve by a Generation Unit | ||
+ | |- | ||
+ | | | ||
+ | :''FIR'' | ||
+ | | | ||
+ | :Fast Instantaneous Reserve | ||
+ | |- | ||
+ | | | ||
+ | :''SIR'' | ||
+ | | | ||
+ | :Sustained Instantaneous Reserve | ||
+ | |- | ||
+ | | | ||
+ | :''Interruptible Load Reserve'' | ||
+ | | | ||
+ | :Reserve available from the reduction of load | ||
+ | |- | ||
+ | | | ||
+ | :''Partly Loaded Reserve'' | ||
+ | | | ||
+ | :Reserve available from increasing generation from unused generation capacity |
Revision as of 14:49, 21 January 2013
The Reserve Management Tool
The inputs to the SPD solver are shown in the figure and table below (adapted from Transpower's Reserve Management Tool (RMT) functional specification). There are two broad categories of input:
- Energy and reserve offers from market participants
- Parameters that define the Reserves requirement are calculated mostly by a software application: the RMT.
Term | Explanation |
---|---|
|
|
|
|
|
|
|
|
|
|
|
|