ifference between revisions of "EMO:Forecasting Terminology"
Jump to navigation
Jump to search
Line 53: | Line 53: | ||
*Create a Transmission System configuration for the Forecast based on the best available data from TPIX | *Create a Transmission System configuration for the Forecast based on the best available data from TPIX | ||
*Allow realistic Reserves, Offer and Demand data to be loaded into the Forecast Definition (typically of historical data). | *Allow realistic Reserves, Offer and Demand data to be loaded into the Forecast Definition (typically of historical data). | ||
+ | |} | ||
Revision as of 11:33, 21 January 2013
Term | Definition |
---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
It is possible to "forecast" into the past using real historical data as well as into the future using synthetic data. EMarketOffer uses the effective date range to:
|
WARNING! A Forecast Definition works with a set of input data limited to seven consecutive days. A Forecast Effective Date Range of 14 days will cause EMarketOffer to re-cycle the loaded Offers and Demand data from the first week for the second week of the forecast. Transmission system data will however change correctly with calendar date beyond the 7th day.